Link 62, Normanton
Scheme Outline: Highways Construction of new spine road, Normanton bypass link roads, two spine road roundabouts and links onto existing live carriageway. Earthworks 1,000,000m³. Excavation, drainage and Structures.
Highways S278 works, live carriageways, TM on live carriageways, Stats diversions management of SU’s new roundabouts. Drainage works attenuation ponds and box culverts under live carriageways.
Client: Premier Property Group & Commercial Development Projects
Value: £13 million Stats diversions: £1.5 million
Additional Details
- Construction of Highways 7.3 mile carriageway 2.5Km plus footpaths, cycleways and 4 No. new roundabouts.
- Roundabout connections onto existing Normanton bypass and construction of new roundabouts under live traffic conditions requiring traffic management and temporary diversions. New roundabout constructed under overhead HV cables.
- Construction of twin box culverts under existing live carriageway and phased diversions of existing services to enable construction works to proceed.
- Coordination of installation of new services to the scheme together with the diversion of existing services.
- Utilisation of GPS equipment and software to calculate cut and fill earthworks balances and trim formations with GPS controlled dozers to +/- 20mm.
- Significant drainage works and construction of significant water attenuation / balancing pond excavations and structures.