New Mistley Embankment
Scheme Outline: The stabilisation of an earth embankment located in an environmentally sensitive area with access only by rail.
Client: Kier Group/Network Rail.
Value: £300,000
Additional Details:
- Restricted access to site by Rail only, created a logistic problem for the supply of plant and materials to the workforce.
- Hewlett’s supply chain relationships and experience in the management of possessions and Road Rail excavators and plant reduced the delivery programme by 30%.
- Careful control of overhead electrical equipment and the live Rail environment were utilised on a daily basis.
- In house Safety critical staff ensured a smooth operation to completion.
- This was complimented by the utilisation of local partnered staff which enabled greater access to pre-planned possessions at weekends.
- Specialised soil nail equipment developed on a previous scheme overcame access issues, which to other package contractors, was a major problem.
- The site team managed the local environment exceptionally well and minimised the disruption to residents on both sides of the line.
- After a large number of night shifts not one complaint about any noise or disruption, a compliment to any management team in such a closed environment.