Webster Hill & Watergate Bridges, Dewsbury
Scheme Outline: The off site fabrication of new bridge decks. The removal of two existing bridges and the installation of two new structures over a 52 hour Christmas possession.
Client: Galliford Try / Network Rail
Value: £2.5 million
Additional Details.
- Hewlett’s location and flexibility allowed resource to be called in early during the Christmas possession taking advantage of gains made during the P’way removal works.
- The in depth experience of the Hewlett management team on-site allowed problems and issues to be dealt with immediately as the work hit snags in the installation process.
- Hewlett’s large in-house fleet of plant, excavators and supplementary plant, backed up by on call PTS fitters, ensured the right plant was available and was used successfully to complete the works.
- Reliability of an in-house directly employed PTS workforce ensured that labour was reliable and worked to the highest standards of safety and quality on a tight challenging programme.