Ousegate, Selby
Scheme Outline: Remediation, roads and sewers, foundations and groundworks to adjacent sites dissected by main road. 75 house units and 3 apartment blocks located on the riverside.
Client: Barratt (York)
Value: £3.6 million
Additional Details:
- Removal and disposal of ash type material, Japanese knotweed and ‘hot spots’ together with importation of capping layer.
- Piling solutions included C.F.A, C.H.D, driven steel (with ring beam) and P.C.C. (beam and pile).
- In-situ under croft car parking to the three apartment blocks – tanked and buried incorporating flood defence walls.
- In-situ 4.8 metre x 1.8 metre x 42 metre culvert.
- Foundations and drainage to the three apartment blocks and 75 houses.
- Associated S278 works and temporary traffic management.