Snelsin Rd, Cleckheaton.
Scheme Outline: The main aspects of the works comprised: remediation of the entire area, removing all below ground structures, uncompacted construction waste, notifiable waste materials, removal and crushing of concrete and blacktop materials, and removal of asbestos from all existing buildings, summarised below.
Hewlett Civil Engineering Ltd. Undertook all of the works and worked closely with the consultants to develop robust strategies for remediation delivered in line with regulations and to programme. All materials (except for untreated water) were treated and remained on site.
Client: Portford Homes.
Value: £4.5 million
Additional Details:
- Removal of main identified contaminated soils including ‘hot spots’.
- Removal of contaminated perched ground water and on site treatment of contaminated soils adjacent to site boundaries.
- Removal of all structures and underground tanks as part of turnover.
- Removal of pipework and sealing off at boundaries.
- Removal of asbestos from all existing buildings.
- Remediation to culvert areas, plus soils validation and testing to all excavated areas to confirm that site clean up comply with clean up criteria.
- Construction of roads and sewers including connections to mains and S278 works.
- Foundations and groundworks to 125 new dwellings.